Current Line (2 line) After Expansion to 1500 ton Line (3 line)
1.Capacity (Shot) 5,796,000 1.Capacity (Shot) 8,404,000
2.Load (Shot) 1,967,526 2.Load (Shot) 1,967,526
3.Load (%) 33.9% 3.Load (%) 23.4%
4.Extra Capa Capa. (Shot) 3,828,474 4.Extra Capa Capa. (Shot) 6,436,474
J300 Operation Floor 22 J300 Operation Floor 36
2010 Operation Floor 31 2010 Operation Floor 45
Based on the 109,307 of J200 production in 2009 (18,236 production in 2010)
Press Capa. Calculation: 21 hours X 23 days X 12 rodnjf (5,796 hours/year)
 
 
Tooling
No. of Company
Tooling Capa.
Total (Internal + Contractor)
Remarks
SET
TON
SET
TON
Item Mold
Internal
- 50 set 250 ton 350 set 1,750 ton  
Contractor
6 300 set 1,500 ton  
Steel
Internal
- 100 set - 100 set -  
Contractor
12 450 set - 450 set -  
Grand Total 18 - - 900 set -  
 
 