| Current Line (2 line) |
After Expansion to 1500 ton Line (3 line) |
| 1.Capacity (Shot) |
5,796,000 |
1.Capacity (Shot) |
8,404,000 |
| 2.Load (Shot) |
1,967,526 |
2.Load (Shot) |
1,967,526 |
| 3.Load (%) |
33.9% |
3.Load (%) |
23.4% |
| 4.Extra Capa Capa. (Shot) |
3,828,474 |
4.Extra Capa Capa. (Shot) |
6,436,474 |
| J300 Operation Floor |
22 |
J300 Operation Floor |
36 |
|
|
| 2010 Operation Floor |
31 |
2010 Operation Floor |
45 |
|
|
|
|
|
| Based on the 109,307 of J200 production in 2009 (18,236 production in 2010) |
| Press Capa. Calculation: 21 hours X 23 days X 12 rodnjf (5,796 hours/year) |
|
| |
 |
| |
|
|
Tooling |
No. of Company |
Tooling Capa. |
Total (Internal + Contractor) |
Remarks |
SET |
TON |
SET |
TON |
| Item |
Mold |
Internal |
- |
50 set |
250 ton |
350 set |
1,750 ton |
|
Contractor |
6 |
300 set |
1,500 ton |
|
| Steel |
Internal |
- |
100 set |
- |
100 set |
- |
|
Contractor |
12 |
450 set |
- |
450 set |
- |
|
| Grand Total |
18 |
- |
- |
900 set |
- |
|
|
|
|
|
| |
|
| |
|
|